MAY'S PROGRESS
The spot cleared for the shop.
The shop hole filled in with stone and the footings in place.
Footings ready for cement.
Baby bottle?.....no.......sippy cup?.......no ..........plastic water bottle......that works!
Snuggle time with mommy,
Pops has very fun buttons on his shirt!
Look at me......I'm the cute baby!
Kisses from Mommy.
McKenna under the bug screen on the dock. She thought the net was too cool!
Test run in the new boat.
Shelly was very busy swtting bugs and the dogs were very excited to go for a boat ride.
This was McKenna's Christmas present from us ......we decided not to buy it till she actually needed it so we would have the right size.
McKenna really wanted to touch the fish......and did....much to my simay as she had just had a bath!
Nice Catch!
We have been up at the lot for 3 weeks now and have made major strides on the cottage and shop. We have our Septic Permit and the Building Permit has been applied for. The Building Inspector gave us the go ahead to start. With his blessing we have the footings for the cottage all ready to go....just waiting for concrete. The area for the shop has been dug out, refilled with stone material, levelled and then a trench dug out for the footing . The re-bar and welded wire mesh are sitting ready to go in.
On the 23rd Luke, Shelly and McKenna came up for 3 days. They started their Bunkie by clearing the area and putting in their footings.
McKenna is growing and changing so fast. She is eating food now and it is very fun watching her eat new things.
Shelly, Colin and Luke went fishing and Shelly caught 2 nice Pike which made a great lunch before they went home.
0 Comments:
Post a Comment
<< Home