Block Work on the back wall almost done.
After we arrived back from our week-end in Barrie it was full steam ahead on the block work and the shop.
The lowest corner and the back wall are blocked up to the height they need to be. Just the sides and the front left to do. On Tuesday we poured the cement for the shop floor. We got exactly the right amount of Ready Mix which was good. The pouring part went very well, a lot of work but good. I had picked up the power trowel the night before so Colin was ready to go as soon as the cement started to set up. It did get away from in a few spots but for the shop it will be fine.
I have spent some time trying to get my garden started but it is slow going. I am not counting on Veggies this year.
Colin ripped the floor out of our boat as it was filled with water logged foam. Now all we have to do is build something back into it.