PROGRESS UPDATE
My pretty flowers at the trailer.
A load of smaller logs for the Bunkie.
The comleted Septic System......just add grass!
The Master pointing out his work.
My piles of sorted wood from the footings.
The shop is coming along nicely.
The first top log finally in place.
The past week has seen great progress on the Shop. We have hoisted the top log on the back wall. The sides should be done by the end of the week and then we can continue work on the cottage.
I went down and took apart all the footing framing and sorted it all into burnable pieces and stuff that could be used again. I also built a new Picnic table .....which if I do say so myself turned out rather well. I think one more coat of Cetol and we will say it is done.
Colin has finished cutting the front pieces for the boat floor and fitted them in.
They also came and finished the Septic System and spread the top soil over it. Looks great! I installed a nice new clothes line over top of it so that will give me some place to dry my clothes out of the direction of the road and the dust that it stirs up.