WORK CONTINUES
Back corner of the cottage.
The back wall of the house....two more courses to go on the highest part.
The back corner of the cottage which will be the bedroom.....over top of our little bit of basement.
The shop is ready and waiting for the installation of the trusses.
Luke and Colin lifting one of the end pieces up into place.
The first gable end up on the bunkie.
Luke using the winch to put a log into place.
I must apologize for being so slow to update this blog but it just is not possible to do over dial up Internet. As I am at Shelly's in Mississauga for a few days this week I have the opportunity to use her high speed connection which makes the whole process a lot faster.
Between the rain and now the hot weather it has been a little trying to get stuff done on the construction of the cottage.
Luke and Shelly have the bunkie up minus the roof, windows and door. It looks awesome.
The cottage is looking good too although not as far along as we had hoped. The back wall is almost all up and the side wall is almost all up. These two are the most difficult as they are the highest. It is very tricky maneuvering the tractor around in there and placing the logs. So tricky in fact....Colin tipped the tractor over one day and we had to pull it with the truck to get it back onto it's wheels. We have our winch set up on the scaffolding to pull the logs into place. Colin has built little ramps to pull them up on and it is quite a site to see one slide up and into place.
1 Comments:
Wow, you're making a lot of progress. The buildings are looking good.