WATER, WATER EVERYWHERE!!!
After I was finished the rock was much cleaner than I was.
The water draining from one side of the driveway ......through the driveway... to the other side.
We drained out about 2 feet of water from one side to the other.
The pieces of the dock went together really easily.....I was glad that we spent the time and built it all last year.
Done!
The dock all in place with the boat tied to it.
Things have been progressing nicely at the lot. We pressure washed the Rock surface and staked the corners of the foundation. We put the dock in, fixed the driveway and set up the bug room at the trailer, they came and did the health inspection for the septic system ...........then disaster struck! Shelly called around supper time to tell us that the basement where we stay while in Fergus, that has all our stuff stored in it, was flooded with 4 inches of water. The sump pump quit working and of course with the Spring run off there was lots of water to come in. We had to leave everything at the lot and head back to Fergus to assess the damages. My bedroom suite is trash, oak dining table and chairs wrecked, countless other pieces of furniture ruined but the worst of all was my Mom's china cabinet. There is water damage to the bottom and I can't replace that. Also a chair that was hers and some embroidered table clothes that she made. Thankfully all my pictures and stuff like that were high and dry so no damage there.
It is going to be a huge task to sort through all the stuff, pitch what is wrecked and repack what is still good and move it to a dry storage location.
I guess it had to be sooner or later.......I guess I would have preferred later.